TAIKONParts TAIKON machines Request

TAIKON C12

31 assembly groups · 166 parts

Point at a unit on the machine — click to open its parts.

Drawing from the operator’s manual. Dashed outlines mark units hidden under the covers; their position is indicative.

All assembly groups

1Upper structure

  1. 1.00Upper structure – overview20
  2. 1.01Upper frame mounting plates14
  3. 1.02Covers17
  4. 1.03Hydraulic tank7
  5. 1.04Engine14
  6. 1.05Cover frame5
  7. 1.06Operator seat6
  8. 1.07Battery3
  9. 1.08.0Operator controls – overview18
  10. 1.08.1Right armrest box6
  11. 1.08.2Left armrest box4
  12. 1.09Radiator3

2Front attachment

  1. 2.00Front attachment – overview22
  2. 2.01Boom swing bracket9
  3. 2.02Boom5
  4. 2.03Arm (dipper)5
  5. 2.04Bucket6
  6. 2.05Bucket linkage3

3Undercarriage

  1. 3.00Undercarriage – overview19

4Canopy

  1. 4.01Canopy7

5Hydraulic lines

  1. 5.01Hoses: rotary joint – travel motors
  2. 5.02Hoses: rotary joint – dozer cylinder
  3. 5.03Hoses: main control valve
  4. 5.04Hoses: pilot joysticks
  5. 5.05Hoses: shut-off valves
  6. 5.06.1Hoses: arm & boom cylinders
  7. 5.06.2Hoses: arm & boom cylinders
  8. 5.07Hoses: gear pump
  9. 5.08Hoses: pilot supply valve
  10. 5.09Hoses: hydraulic oil cooler
  11. 5.10Grease lines